|
Out warding/ In-warding, storage of raw materials (RM) and packing material (PM)
|
|
|
Production Issue of Raw Materials & Packing Materials as per the process Order.
|
|
|
RM Storage Classification Ambient, AC Storage, Bulk Tanks & Petroleum Bulk & Non Bulk. (Monitor Petroleum license limit on daily basis)
|
|
|
Bulk tank operations (unloading, sampling and cleaning of tankers)
|
|
|
Maintenance of critical stock of packing Materials& bulk Tanks through Kanban Process.
|
|
|
Dispatching of Finished Goods to the right location on right time as per the SCM confirmation.
|
|
|
Identification of Non-moving Material & plan for consumption, Stock Transfer Order or disposal based on SCM confirmation.
|
|
|
Reassessment of stored materials & extension of the SLED ( Self Life Expiry Date) of materials
|
|
|
Interplant transfer of the RM & PM
|
|
|
Maximum space utilization for RM & PM
|
|
|
Maintain Inventory accuracy through gaps identify in physical counting activities.
|
|
|
Reprocessing or disposal of rejected material Raw Material, Finished Goods and packing Material.
|
|
|
Performance of 5S activities.
|
|
|
SOP adherence through TS16949 Internal Audits and department level audits.
|
|
|
Warehouse EHS performance through FPAM Audits on Monthly basis & EHS Audit through PPG Team.
|
|
|